BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//89.9 The Wave - ECPv4.6.26//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:89.9 The Wave
X-ORIGINAL-URL:https://899thewave.fm
X-WR-CALDESC:Events for 89.9 The Wave
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190920
DTEND;VALUE=DATE:20190921
DTSTAMP:20260626T173247
CREATED:20190530T224534Z
LAST-MODIFIED:20190530T224534Z
UID:9074-1568937600-1569023999@899thewave.fm
SUMMARY:Rambo 5
DESCRIPTION:Rambo 5 : Last Blood. Released September 20\, 2019 . \nIt is the fifth installment in the Rambo franchise. \nRambo travels to Mexico to save a friend’s daughter who has been kidnapped by the Mexican cartel. \n
URL:https://899thewave.fm/event/rambo-5/
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190920
DTEND;VALUE=DATE:20190921
DTSTAMP:20260626T173247
CREATED:20190608T234819Z
LAST-MODIFIED:20190608T234819Z
UID:9306-1568937600-1569023999@899thewave.fm
SUMMARY:National Pepperoni Pizza Day
DESCRIPTION: \n
URL:https://899thewave.fm/event/national-pepperoni-pizza-day/
END:VEVENT
BEGIN:VEVENT
DTSTART;VALUE=DATE:20190920
DTEND;VALUE=DATE:20190922
DTSTAMP:20260626T173247
CREATED:20190918T195718Z
LAST-MODIFIED:20190918T195718Z
UID:10259-1568937600-1569110399@899thewave.fm
SUMMARY:Lane closures on the MacKay Bridge
DESCRIPTION:Two lanes of the MacKay Bridge will be closed from 7pm Friday\, September 20 until the bridge closes to all traffic Sunday\, September 22 at 5am. The bridge will reopen 5am Monday\, September 23. The closures are needed to continue resurfacing the two Dartmouth-bound lanes. The work is weather dependent so will be cancelled if necessary. \n
URL:https://899thewave.fm/event/lane-closures-on-the-mackay-bridge/
END:VEVENT
END:VCALENDAR